feuervogel: photo of the statue of Victory and her chariot on the Brandenburg Gate (Default)
feuervogel ([personal profile] feuervogel) wrote2014-06-02 05:50 pm

I can run cons.

After my experience with the convention I used to work with (that shall not be named), I was expecting to be running around like a chicken with my head cut off for the last week or two, then be constantly busy with doing stuff during the con.

Apparently, if you're not a micro-managing control freak, and you trust your department chiefs to a) be competent and b) get shit done, it's a lot easier.

My tech ops chair has 17 years of experience at Dragon Con. All I know about tech ops is that it's important and involves a/v and making sure things work right. At the post-con imbibing of scotch, there was a mutual "you're awesome!" "NO U!!" going on. My security chief has about 5 years of experience at Dragon Con, and she asked me something a few months ago about security, then made a team (from Dragon Con people).

I am really good at big-picture stuff, organization, timelines, to-do-lists, spreadsheets, and that sort of thing. I have a result that I want, and I'm not extremely fussed about the steps taken to get the result (as long as it doesn't result in shoddiness). I'm a compulsive planner, but I tend to get bored at the point of execution.

It's weird: I always thought I was kind of a control freak (or have been called that), but what it really is is that I like organizing things. A lot. (I'm an ESTJ.)